2022 Zonguldak Catalağzı Eren Enerji Sualtı 3250 Çap Boru Tamiri
Alanya Terminal 4000 m Underwater Fuel Oil,LPG Pipeline Installation and inspection.
Underwater Concrete Block Installation.
Port Maintenance and Installation of Cathodic Protection System
Marine Pile Cutting at -50 m
Bathymetry
Rig Propeller Removal at -15 m
Periodic Maintenance for Subsea Instruments (ADCP ) at -65 m- Underwater cable assembly -65 m
Rig Propeller Removal at -20 m & Dredging
Underwater Welding at Doha, Qatar
Cleaning of Underwater Intake Structures & survey
Marine Pile Removal at -55 m
Installation of Subsea Instruments (ADCP ) at -60 m
5 Years ISPS Contract
3250 Pipe Line Repair cutting and welding
SEDCO Rig Propeller Removal
Supply and Instalation of Marine Pile Protection System
Dredging and Backfill
Koman & Fierza Dams Stoplogs Underwar Mnt. & Rep. Works
Underwater cleaning and welding
Energy Community of South East Europe APL Program -APL 5 for Albania-Underwater inspection -70 m
(c) 2023 Demar Marıne - All rights reserved.